Commercial and workplace EV charging
Smart Power installs workplace, commercial and fleet charging, primarily AC equipment up to 22 kW where suitable. We also discuss larger rapid/DC or publicly accessible projects individually, with the scope and operational responsibilities agreed for each site.
Different vehicles. Different charging needs.
A staff car parked all day, a fleet van with a fixed departure time and a retail visitor stopping briefly create different requirements.
Workplace and staff
Consider bay allocation, how long vehicles stay, who can charge and whether access is free or paid.
Company fleets
Work backwards from mileage, return times, departure schedules and each vehicle’s energy requirement.
Customer and visitor charging
Consider dwell time, signage, access, lighting, customer support and payment arrangements if charging will be public.
Sites planning to grow
Think about likely additional bays, cable routes and spare distribution capacity, without paying for unnecessary infrastructure now.
How many chargers does the site really need?
Installed power alone does not tell you whether vehicles will be ready on time. The design needs to look at energy, parking duration, simultaneous demand and available headroom.
Four vehicles each needing 20 kWh over eight hours require 80 kWh in total before charging losses — an average 10 kW over that period. This does not automatically mean four 22 kW units are appropriate. Vehicle limits, load balancing and practical schedules all need assessing.
Think about operation, not just installation.
Commercial EV installations may involve charger hardware, distribution works, cabling, civils, network requirements and optional software or payment systems. We discuss how your site will operate before defining the scope, and quotation prices include VAT.
Site electrical works
Cable routes, protective arrangements, possible distribution upgrades and any network requirements.
Charging management
Who creates accounts, controls access, sees usage and responds to errors? Confirm the specific hardware and provider.
Ongoing costs
Software subscriptions, data connections, payment-processing fees, maintenance and electricity may all be relevant.
Publicly accessible charging
Smart Power welcomes publicly accessible charging enquiries for individual assessment. Ownership, payment, access, maintenance and any public charging regulations need to be considered before a solution is agreed.
See the installations
A closer look at home and workplace charging equipment and how installations can be positioned and finished.



Frequently asked questions
An initial scope discussion can establish the right route for your site.
Do we need the fastest available chargers?
No. Charging needs depend on the time each vehicle is parked and the energy it needs before departure.
Can load management avoid an upgrade?
It can sometimes make better use of capacity but cannot create unlimited power or meet every fast-turnaround requirement.
Can we expand later?
Sometimes phased infrastructure makes sense. The right approach depends on site layout, future demand and cost.
Can staff or visitors pay for charging?
Various access and payment systems exist. Confirm the selected hardware, operator model and responsibilities.
Do grants cover commercial charging?
Some applicants and installations may qualify for government support. Eligibility, installer authorisation and current scheme rules must be checked before pricing is promised.